All Required Forms Regarding Plan Review and Approval
Page 1 of 11
-
FORM SCG-9011 Window Film Acknowledgement letter
Effective 7/1/2018, this letter is required for window film installations on new glass and glazing
-
FORM SCG-9002 Natural Light and Wireless Technology Letter
This letter is required for all project types
-
FORM SCG-9003 Plan Review Phasing Letter
This form is required for all project types including single-phase projects (Form revised 7/1/18)
-
FORM SCG-9006 Non-conforming Floors/Ramps Letter
Non-conforming Floors and Ramps Letter
-
FORM SCG-9007 School Safety Infrastructure Criteria Letter
SSIC Letter
-
FORM SCG-9009 Site Central Location Letter
SCG-9009 Site Central Location Letter
-
FORM SCG-9010 Photovoltaic Vandalism Letter
This letter is required for all Photovoltaic (PV) system installations
-
FORM SCG-9004 Space Standards Letter
(Form revised 7/1/18)
-
FORM SCG-9005 Granular Accessible Routes Maintenance Letter
Granular Accessible Routes Maintenance Policy Letter
-
Summary Report of the School Facilities Survey 2021
The School Facilities Survey captures information that Local Education Agencies are required to submit to DAS or the at various intervals required in C.G.S.,Section 10-220, with the most recent statutory date being July 1, 2021.
-
Connecticut Green LEAF School Brochure
What is a Connecticut Green LEAF School?
-
Connecticut Green LEAF Schools Letter
Letter to School Superintendents to participate in the Connecticut Green LEAF Schools Program (March 15, 2013)
-
School eSupplier Introduction_v5b
Overview of new grant application process posted 11/26/18
-
FORM SCG-1001 Alliance Grant Program
Alliance Grant Program Application Materials
-
FORM SCG-1031 Sample Educational Specification for School Building Project
Sample Ed Spec