All Required Forms Regarding Plan Review and Approval
Page 2 of 11
-
FORM SCG-7600 Report on the Condition of CT's Public School Facilities (2013)
DAS - Report on the Condition of CT's Public School Facilities (2013)
-
FORM SCG-7011 School Safety Infrastructure Council (SSIC) Standards
Commissioner's memorandum on SSIC standards
-
FORM SCG-3075 Audit Requirements for School Construction Grants
Commissioner's memorandum on Grant Audit Procedures
-
FORM SCG-3049 Plan Review Procedures
Commissioner's memorandum on New Plan Review Procedures
-
Final Grant Application for a School Building Project
-
FORM SCG-4000 INST Ineligible Costs and Limited Eligible Costs Worksheet Instructions
Ineligible Cost and Limited Eligible Cost Worksheet Instructions
-
FORM SCG-4015 Eligible and Ineligible Items for FF&E and Technology
Eligible and Ineligible Items for FF&E and Technology – Revised 11/2024
-
FORM SCG-3048 High Performance School Construction
High Performance School Construction Bulletin
-
FORM SCG-3013 Checklist - Carbon Monoxide (CO) Detectors
Carbon Monoxide (CO) Detectors Checklist
-
FORM SCG-3011 Checklist - Asbestos/Hazardous Materials
Asbestos/Hazardous Materials Checklist
-
Content List: Table of Contents for FORM SCG-2500 Standards and Guidelines
Standards and Guidelines: Table of Contents
-
FORM SCG-3002 Checklist - Design Development Review (DDR)
For reference only: Plan Review no longer holds DDR meetings (rev. 2/1/2024)
-
FORM SCG-3012 Checklist - PCB Abatement and Management Plan
PCB Abatement and Management Checklist (Stand-Alone Project or Phase)
-
FORM SCG-3030 Code Conformity Certification
Form content revised 7/25/18
-
FORM SCG-2500 Standards and Guidelines Chapter 6: Program Space Guidelines
Standards and Guidelines Chapter 6: Program Space Guidelines